Skip to content

Tag «ENERGY VAULT'S TEST SITE»

Solve Clean Energy’s Significant Drawback

IN A SWISS VALLEY, an uncommon multi-armed crane raises two 35-ton concrete blocks high into the air. The blocks delicately inch their method up heaven steel structure of the crane, where they hang suspended from either side of a 66-meter-wide straight arm. There are 3 arms in total, every one real estate the cords, winches, …